Construction Gallery -Aug 13, 2015

CONSTRUCTION REPORT

Pipeline – DOT Inspection – 42” Pipe Coating
LQF – First Concrete from Batch Plant
LQF – First Aggregate Batch on Conveyor
LQF – Construction Dock Outer Cap
LQF – Construction Dock Piles
LQF – Soil Stabilization in Area 9E
LQF – Velasco Drainage Ditch Culverts
PTF -  view looking south – soil stabilization in Unit 62
PTF - view looking northwest – mixing lime in North Laydown Area and hauling to Unit 62
PTF - view looking northeast – Mechanic Shop and South Laydown Area

THE ISLE - FREEPORT LNG REPORT FROM QUINTANA ISLAND