Construction Gallery - September 01, 2016

CONSTRUCTION REPORT

LQF – View looking south – Train 1, Area 1191 Pipe Rack
LQF – View looking south – Train 2, Area 1291 Area Paving
LQF – View looking east – Unit 17, Area 1791 Pipe Rack, 36” NG Pipe Installation
LQF – LNG Tank #3 Floor Leveling Concrete Placement
Marine – 96” Mooring Dolphin Piling Installation
PTF – View looking southeast – PTF Overall Site
LQF – Unit 60 View looking north – 6003, 6004 and 6092 Pipe Racks
Unit 67 View looking east – 67T-90 Amine Storage Tank